Sankoty Lakes Campground

THE CHALLENGE Sankoty Lakes is a world-class wilderness retreat in central Illinois, complete with crystal clear water for trout and fly fishing. Sankoty Lakes required specialized electrical and plumbing solutions, to create a sustain-able fishing habitat. They also needed electrical and plumbing systems designed for their glamping cabins, pavilion restaurant, shower and restroom facilities, and […]

IBEW Hall – Peoria

THE CHALLENGE The local Electrical Union needed a new hall to accommodate their current and future needs, including the potential for solar panel installation. An exposed ceiling structure meant we needed to creatively route MEP system distribution for aesthetic appeal. A tight budget and unique design required careful coordination.   KED SOLUTION : State-of-the-Art Electrical […]

UnityPoint Health Methodist

THE CHALLENGE The hospital needed to replace their linear accelerator with a new, fully upgraded replacement. With the machine upgrade, came necessary adjustments to the existing space and systems for it become operational. Electrical and HVAC systems needed to be relocated due to the additional wall thickness and necessary hallway extension. Also, the fire protection […]

OSF Radiation Oncology

THE CHALLENGE OSF’s Glen Park location needed to replace their aging MRI machine. With this, they also wanted to renovate their existing MRI room, in hopes of creating a more welcoming, comfortable atmosphere for patients. A specialized lighting designer was brought on to the project to help achieve the desired aesthetic, so we coordinated with […]

Bloomington-Normal YMCA

THE CHALLENGE The client wanted to open a new YMCA location that would include a competition pool, a leisure pool, youth areas, childcare, administrative areas, and a community center. This design-build project required coordinating the new systems with the pre-existing electrical system in the building was challenging. Also, another engineering firm that specializes in HVAC […]

Connect Transit

THE CHALLENGE Connect Transit is beginning to transition to battery powered buses. Their goal is to reduce the carbon footprint of the city buses. They requested our expertise to engineer a solar solution to charge the battery-powered buses.   KED SOLUTION : Creating a Charging Solution We determined that solar panels would provide both an […]

Gibson Area Hospital & Health Medical Office Building

THE CHALLENGE Gibson Area Hospital and Health needed to add a medical office building (MOB) on to its existing building in order to better serve its community’s needs. Although the MOB would be attached to the hospital, it was to be designed with entirely new, separate MEP/FP systems. The MOB needed to house many different […]

Herndon Building – Springfield, IL

THE CHALLENGE The Illinois Secretary of State owns the building that currently houses the State Police Department. Physically, the building has a lot of unused space that the Secretary of State would like to be able to occupy, however, the uncontrolled temperature conditions have made the building an undesirable work environment. The building is a […]

Metamora Township High School

THE CHALLENGE Metamora Township High School needed to convert their old shop areas into new, conditioned extracurricular spaces. The existing rooftop units needed to be adjusted, and several new units needed to be added, in order to properly condition the area. Each space had to be individually designed, as each room was to have a […]

Gibson City Hospital

THE CHALLENGE Gibson City Hospital needed an additional operating room to meet demand, so we were hired to transform an existing storage room into a new operating room. However, there were challenges, as the existing HVAC infrastructure wouldn’t be able to handle an additional cooling load. There also wasn’t enough power to support another fully […]