Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The two 20-year-old chillers providing air conditioning at this small rural medical center had reached the end of their useful lives. The cost to operate and maintain them kept growing, and the hospital was concerned one of the units might fail at any time. Unfortunately, lead times to acquire new equipment were long.
We arranged for pre-purchase of two new 250-ton, energy-efficient centrifugal chillers, ensuring they would arrive in time for installation before warm weather. We replaced both the chilled water and condenser water pumps, installing variable frequency drives to match pump speed and load—another energy saver. We also connected the chillers and pumps to a new Direct Digital Control (DDC) system for ease of operation.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s