Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The air-handling unit serving the nursing school failed in the fall of 2017. Fixing it was cost-prohibitive, and the university was forced to rent a temporary unit to maintain air conditioning. Another problem with the failed system was the lack of a return fan, which led to over-pressurization in the building — keeping doors from latching and creating security issues.
Our design created a new steel-frame structure for the roof of the three-story building, where we placed a custom 17,000 cfm air-handler designed to fit the same footprint as the previous unit. It ties into the existing ductwork to feed the distribution system. A variable-volume unit, the new air-handler modulates supply-and-return air flow to keep the building at optimal pressure. We also upgraded the building’s temperature controls, converting them from pneumatic to direct digital control (DDC).
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved