Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
This small district of nearly 500 students operates three schools—elementary, junior high and high school—on one campus. Built in 1963, 1955 and 1922, respectively, the buildings required various mechanical and electrical upgrades to improve comfort and safety for students and staff. The district’s goal was to complete all work during the summer when school was not in session.
We upgraded the elementary school’s heating and ventilation system—which previously relied on radiant heat and open windows—with three new rooftop units providing forced-air distribution and dehumidification. We also replaced an aging hot water boiler with a new condensing high-efficiency boiler and installed a generator for emergency power. At the high school, we installed a new high-efficiency burner in the boiler and replaced the steam boiler providing heat to the adjacent shop building.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s