Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
District administrators wanted to establish Calvin Coolidge as a community hub for athletic events, but doing so required making significant physical improvements to this school originally built in 1937 — as well as balancing the need for public access with student safety.
Supporting the school’s addition of a full-size athletic gymnasium — which included restrooms, locker rooms, a lobby, a concession area and an office — required full-service engineering design. We installed two rooftop HVAC units as well as lighting, plumbing, fire protection and fire alarm systems. We also fitted the building with a new access-control system that allows community members to enter public spaces while keeping school areas securely locked.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved