Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Peoria School District 150 set a goal to have air conditioning in all its schools by 2020. Richwoods High School, originally built in 1955, first needed to retrofit its HVAC system so air conditioning could be installed. The school also required updated lighting.
We replaced the antiquated boiler and pump and installed an air handling unit and ventilators with a chilled water coil. In the natatorium, we replaced the pool air handling unit with a dehumidification unit and installed new LED lights. Existing piping received abatement treatment, making the school a safer learning environment.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s