Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Originally constructed in the 1960s, Manual High School’s HVAC system had not been upgraded since. In addition, the building did not have air conditioning. We were asked to provide a cost-efficient upgrade.
We removed the antiquated boilers and replaced them with a more efficient hot water system. Use of a dual temperature system, which allowed us to run just one set of pipes for both systems, saved on piping costs. We added air conditioning through the installation of three 200-ton scroll chillers, quieter units that won’t disturb students’ learning. Finally, we engineered the building to operate on a zoned system, providing additional energy savings.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s