Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
High humidity levels in the library were making the space uncomfortable and potentially promoting the formation of mold and mildew — prompting the university to request a study.
Our assessment of the HVAC systems and fan coil unit uncovered a number of problems. Certain units had excess capacity while others were deficient due to an imbalance between water and air. Exhaust systems also were removing excessive amounts of air, causing the building to operate in a negative pressure condition. In addition, the unit responsible for bringing air into the building was undersized. We recommended installing an appropriate sized air handling unit to meet needed capacity, replacing the fan coil units and integrating a direct digital control for facility operators.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s