Project

Consolidating Oncology Providers

Northwest Oncology P.C.

$9.44 million

budget

30,000

sq. ft

Gallery

The Challenge

The owner was looking to build a new, larger oncology clinic. His building expansion goal was to provide space so patients could see multiple doctors in one building. The owner and his colleagues need- ed an efficient building with an economical design of multiple complex MEP/FP systems.

 

KEDbluestone Solution

We designed the space to provide energy savings while incorporating cost savings strategies. The exterior of the building was constructed largely of glass making the design of the HVAC distribution system a challenge. We coordinated with the architect to reduce the mechanical load through glass selection. We concealed all the MEP/FP systems from public view to provide a clean look. A standby generator was included to assume the building load. The new space accommodates fire protection and plumbing systems. The result was a leading diagnostic and cancer treatment medical facility, all while creating a comfortable environment.

Location/Map

View our Other Projects