THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The owner was looking to build a new, larger oncology clinic. His building expansion goal was to provide space so patients could see multiple doctors in one building. The owner and his colleagues need- ed an efficient building with an economical design of multiple complex MEP/FP systems.
We designed the space to provide energy savings while incorporating cost savings strategies. The exterior of the building was constructed largely of glass making the design of the HVAC distribution system a challenge. We coordinated with the architect to reduce the mechanical load through glass selection. We concealed all the MEP/FP systems from public view to provide a clean look. A standby generator was included to assume the building load. The new space accommodates fire protection and plumbing systems. The result was a leading diagnostic and cancer treatment medical facility, all while creating a comfortable environment.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s