Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Upgrading this hospital’s pharmacy to meet stringent new cleanliness standards was made extra challenging by space limitations, prefabri-cated walls that required electrical coordination with the manufacturer, and a lack of electrical drawings accurately showing power distribution for critical equipment and life safety branches.
To address cleanliness requirements, we installed a variable speed condensing unit that permitted year-round air conditioning, a HEPA-approved exhaust fan for the fume hood, a compact humidifier located in the janitor’s closet and flat, washable lenses in the lighting. All equipment met NFPA99 standards. We also rerouted plumbing out of the cleanroom suite ceiling, which was sealed for pressurization and control contamination, for easier access.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved