Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The OSF Healthcare System is constructing a new 40,000 square foot Cancer Care building to serve the community. We were hired as the commissioning agent to verify the systems design to ensure that there was proper installation and system function to maximize efficiency. Proper installation is crucial as it directly impacts, productivity, comfort and occupant health.
Our assessment included the air handler, hydronic piping system, boiler, air cooled chiller, emergency generator, and normal and emergency power. We evaluated the air handling system for the building as incorrect installation can cause deficiencies in the performance of the equipment. We evaluated the boilers to ensure that they were set to the proper set points and schedules were properly configured. Overall, the inspection helps to ensure a comfortable environment for the oncology patients.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved