Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
With its two boilers at the end of their useful life, Seneca High School wanted to take advantage of the opportunity to improve energy efficiency by installing a new system—but at the same time, keeping upfront costs low was also a priority.
To help the high school meet both its cost and efficiency objectives, we replaced the existing boilers with a hybrid boiler plant, using one non-condensing boiler and one condensing boiler. This approach kept initial costs lower without sacrificing energy efficiency, providing the best return on investment for the school. We teamed up with local mechanical contractors to install the new system as part of an Energy Savings Performance Contracting (ESPC) project.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.