Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
After 20 years of use, the college’s biology and chemistry labs needed major upgrades to accommodate the way today’s students learn. Working within the existing structure required careful coordination to avoid penetrating structural beams. Coordination with both the school and the architect was essential to meet the extremely tight summer construction schedule.
In the biology lab, we installed a single-point exhaust system over the demonstration area, with sound-deadening insulation connections to mitigate noise distractions. In addition to upgrading the existing local branch panel, we designed a new isolated power branch panel that provides a grounding pathway to protect sensitive lab equipment. We also added acid waste piping to new sinks and reworked natural gas lines with emergency solenoid shut-off valves for safety. In the chemistry lab, updates included the addition of an exhaust fan and fume hoods.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs