Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Following a devastating fire, this local Chevrolet dealership was eager to rebuild. We were selected by a subcontractor to provide design-build services for the new service center, showroom, offices, body shop, parts area and supporting spaces — all of which needed to meet specific standards set by Chevrolet.
Design-Build for Pre-Engineered Building
To address the temperature requirements of different functional spaces, we chose a multi-zone, variable refrigerant flow (VRF) split system that can provide heat to one area and cooling to another at the same time. In both the service area and body shop, we installed exhaust systems that pull fumes out of the building. To control solar heat gain in the all-glass showroom and lounge, we designed a rooftop air handling unit to control temperatures around the perimeter of the building. The project also included specialized CO2 and NO2 alarm systems.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s