Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
To serve a growing community, this local fire department built a new central fire station—a pre-engineered building that needed upgrades to meet specialized requirements—and renovated three existing stations to increase their capacity and replace outdated systems.</p>
As part of the design/build process for the new central fire station, we upgraded the electrical system and added an emergency generator and door control interface to reduce fume exhaust. We installed a make-up air handling unit and vehicle exhaust system to provide fresh air in the apparatus bay, along with in-floor radiant heat to keep the space comfortable in winter. We also designed exterior lighting, training and sleep rooms, a kitchen and antenna towers. Renovations to the existing stations included electrical upgrades, new restrooms and storm shelters, and interior remodels.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved