Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Natural Fiber Welding needed to upgrade their chilled water system, as it is a crucial component to their manufacturing process. The chilled water system continuously cools the manufacturing equipment, preventing the equipment from overheating. With the upgrade, the client also wanted to allow for additional capacity abilities in the future. Our design included increasing electrical capacity by any required changes electrically.
KED centralized the chilled water system, updating all necessary piping and equipment. We added two, state-of-the-art, highly efficient chillers for maximum chilling capacity. We increased the electrical system and provided spare capacity for future growth. As a result, Natural Fiber Welding’s chilled water system is updated, consolidated, and equipped for any capacity abilities they might need in the future.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs