Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Rolling Acres needed to add air conditioning to their school and replace their existing heating system with an upgraded, streamlined system. However, Rolling Acres has had eight additions to the building since originally being built, making system designing much more complex. An additional boiler room was added with the most recent additions, making the school’s heating bill much higher than necessary and taking up more space.
We replaced the existing heating system with a new, upgraded system and extended it throughout the entire building. By streamlining and extending the heating system, the school was able to eliminate the second boiler room entirely, helping to reduce costs and usable space. The previous boilers were only 70-80% efficient, but the new boilers are 98.6% efficient, which helps save on costs also. We added air conditioning and DDC controls to the school to provide comfortable temperatures for students throughout every season.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved