THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Gibson City Hospital needed an additional operating room to meet demand, so we were hired to transform an existing storage room into a new operating room. However, there were challenges, as the existing HVAC infrastructure wouldn’t be able to handle an additional cooling load. There also wasn’t enough power to support another fully equipped OR and plumbing wasn’t readily available in the space. The space lacked existing electrical plans, adding complexity to the design process as well.
We overcame the lack of documentation electrically through extensive fieldwork and coordination. We found new feeders to power the space and added lighting and data as well. We added a dedicated, AAON brand rooftop unit to avoid overloading the existing HVAC system. The AAON assisted in improving energy efficiency as well. Plumbing was extended to meet the new needs of the space. As a result, the hospital now has a brand-new, fully functional operating room, helping to meet increased capacity demands.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s