Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Eureka High School needed to add air conditioning to their existing building and improve heating in specific areas. The existing building had masonry ductwork, which is not documented on floor plans, making it difficult to trace throughout the building. Creating system pathways was challenging due to the space constraints and unusual classrooms layouts. The school also wanted to use specialized DuctSox, fabric ductwork in the design, adding complexity.
Our design included the specialized DuctSox fabric ductwork in the gymnasium, eliminating the worry of denting ductwork in athletic spaces. We performed fieldwork to determine the best system pathways and replaced the existing masonry ductwork throughout the building. With the addition of air conditioning and the improvement of existing heating, Eureka High School now has a fully upgraded HVAC system, providing a much more comfortable learning environment year-round.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s