Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
West Prairie School District 103 needed to transform the district’s middle school into a new junior-senior high school, however, the existing building was too small to house both junior and senior high students. Another specific challenge with this project was that the existing facility did not have a cafeteria. Previously, the middle school had to transport its students to the elementary school for meals, causing daily logistical issues. Additionally, it was not air conditioned, resulting in shortened schedules and school cancellation due to heat.
We designed systems for an addition to the building that included a secure vestibule, new offices, new classrooms, and a technology wing. A kitchen and cafeteria were also included in the new design of the building, greatly improving daily operations. Our mechanical system design included air conditioning, ensuring comfortable temperatures for students year-round, and eliminating school schedule disruptions. All existing spaces were renovated, including the bathrooms, locker rooms, and classrooms. As result, West Prairie School District now has a state-of-the-art junior-senior high school that is large enough to house its students in one facility and has improved functionality for daily operations.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved