Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
As a part of a larger facility master plan, Heartland Community College needed to relocate their facility testing center. The school wanted to re-purpose the Workforce Development Center from its current use of technical trades training into the new center of student life and student services on campus. The testing center relocation posed challenging ductwork designs, due to tight construction spaces. The new testing center also had very specific design requirements in order to meet Pearson educational testing standards.
We designed the space to accommodate all testing center needs, ensuring it would be approved by Pearson. BIM Revit software helped us mitigate the spatial constraints, through which we were able to fit all ductwork and HVAC equipment in the allotted space. As a result, the school now has a new, Pearson testing center in the desired location, with better temperature control and energy efficiency, thereby making progress toward the building’s overall transition.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved