Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The Emergency Telephone System Board had outgrown their existing spaces and needed to update their existing systems at both the Peoria and Bartonville locations. The Peoria location needed to update their security cameras, fire alarm, and lighting systems while tying into the existing building systems. The Bartonville location had both space and budget constraints.
To accommodate the Bartonville location, we designed simple, economic systems. At the Peoria location, we closely coordinated with the existing system vendors to ensure that the new systems tied into the existing systems seamlessly. We also specified a new fire alarm system dedicated to the ETSB spaces. A backup power system was designed with an uninterruptible power supply (UPS), thereby ensuring the 911 Call Center would never go down due to a power outage. The client benefited from enhanced security measures as we updated their door access control to limit access to authorized personnel.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved