Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Originally built in 1962, Sterling Middle School faced two common problems, the need for air conditioning and to increase energy efficiency. The building structure and minimal space above ceiling, left little space for the installation of necessary ductwork. The school also had specific security and data needs.
We installed a 96% efficient boiler with modulating turn down ratios to match the building’s heating needs. To create more space for the installation of new ductwork, ceiling heights were lowered, which also required lights and data cabling to be lowered. Our design utilized all new LED lighting, providing superb energy efficiency. Thermaduct was installed as a weather resistant and energy efficient duct work for the Roof Top Units. Web-based controls allows the boilers to be monitored remotely.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s