Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
As part of a previous facility assessment, we recommended replacing the school’s chillers. When the district acquired the necessary funding, replacement had to wait until fall to avoid losing air conditioning during the summer months. Completing the work while school was in session required careful timing and analysis of weather conditions.
The previous system lacked redundancy, and when a chiller failed, temperature and humidity would rise to uncomfortable levels. We increased the number of chillers from two to three, raising capacity by 50%, and partnered with a structural engineer to add the extra chiller to the roof safely. We also designed a new pumping system to ensure constant flow and installed a Spirotherm air separator to prevent air lock, both of which help ensure more stable performance and a more pleasant learning environment for students and staff.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s