Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Peoria Public Schools’ district-wide plan to add air conditioning to all schools included the Lindbergh Middle School building, which was still being served by its original, inefficient boilers. Unit ventilators in the classrooms were built into base cabinets and shelves, which required retrofitting the new system to work with these existing spaces.
We installed air conditioning units and modulating hot water natural gas boilers to match the building load — increasing efficiency from 75-80% to nearly 97% — and custom-engineered classroom ventilators to fit the existing cabinetry. Digital controls allow the maintenance team to control any unit in the building remotely and receive alerts if issues occur. We also re-piped the boiler room and replaced the domestic water heating system to ensure hot water is delivered to all sinks quickly.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved