Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
A generous gift from a retired Eureka College professor helped fund the construction of Sanders Hall, a four-story addition to the existing 1916-era science building. Energy efficiency and use of local resources were top priorities for the university, as was achieving LEED (green building) certification.
The new facility features a state-of-the-art chemistry lab, tiered multimedia classroom with teleconferencing technology, four classrooms, seminar room, faculty offices, study lounge and more. To address energy efficiency concerns, we used special modeling software to simulate the building’s energy performance prior to construction, then installed a geothermal system for heating and cooling, an energy recovery system, a lab ventilation system and LED lighting. Sanders Hall received LEED Silver certification.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved