Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
As this medical center expanded over the years, it began to outgrow the performance of its standby generation system. A more than 30-year-old generator in Energy Center 1 failed, while two additional generators in Energy Center 2 no longer provided enough capacity to satisfy code requirements.
To replace the failed unit in Energy Center 1, we worked with OSF to help specify and coordinate the pre-purchase of a new generator and, when it arrived, modified the emergency distribution system to ensure it would seamlessly accommodate the new equipment. To increase capacity in Energy Center 2, we replaced the two existing standby units with three new generators, modifying the paralleling switchgear and downstream emergency distribution. We also installed new day tanks and fuel oil supply and return piping for the three units.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved