Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
To meet growing demand for less-invasive procedures to diagnose and treat diseases, the hospital decided to convert an existing space into a new interventional radiology suite. The design included a large medical equipment room with tight environmental requirements.
We designed a dedicated cooling system for the medical equipment room to ensure safe conditions for the suite’s expensive technology. We also coordinated directly with the equipment vendor on all power, data and communication systems designs. Other improvements included installation of new plumbing fixtures, medical gas and replacement of existing fire protection equipment, as well as upgrades to lighting, heating and cooling, and power systems.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved