This project involved a comprehensive interior renovation, transforming a section of the building into a conference center, constructing a new employee entrance with 20,000 square feet of additional office space, and upgrading the cafeteria and kitchen. A primary challenge was to complete these upgrades while keeping building operations functional, requiring a strategic, phased approach to minimize disruption. To manage workspace continuity, the team used off-site swing space and a 4-phase schedule for relocating workstations as each area was renovated.
KEDbluestone designed a phased renovation plan that allowed for continuous operations while enhancing the building’s functionality. A new chilled water/hot water VAV system replaced the HVAC system, along with extensive upgrades to building automation. The team installed a new lighting system with programmable controls and daylight harvesting, modernized the electrical distribution, and incorporated integrated lighting and A/V controls in the conference center. The renovations also included a complete refresh of network, CATV, access control, and CCTV systems, delivering a fully modernized and efficient workspace.
We use cookies and similar technologies for analytics and marketing. Necessary cookies keep the site working. See our Privacy Policy, Cookie Policy, and Website Service Policy.