Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
OSF’s Glen Park location needed to replace their aging MRI machine. With this, they also wanted to renovate their existing MRI room, in hopes of creating a more welcoming, comfortable atmosphere for patients. A specialized lighting designer was brought on to the project to help achieve the desired aesthetic, so we coordinated with both the designer and the equipment supplier on this project. The project’s schedule was fast-paced, as downtime needed to minimized.
We worked quickly and efficiently to meet the fast-paced schedule. We coordinated with the MRI supplier, as well as the lighting designer, to create system designs that achieved the client’s patient-centered space. We replaced the existing MRI with a new, state-of-the-art MRI machine. We assisted in the specialized lighting design, ensuring the design vision and comfortable feel was attained. The OSF Glen Park location now has a reliable, modernized MRI machine, as well as a new, tranquilizing space for their patients.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs