Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Graham Hospital had two existing, interconnected chilled water systems, however, they were not functioning at their full potential in providing air conditioning. Simultaneous operation would result in pumping complexities, poor balancing, and limited control. The hospital not only needed to fix the problems at hand, but also wanted to create system redundancy, to ensure the hospital would never experience system failure or downtime, a critical component of the HVAC system.
We optimized the chilled water system functionality by replacing the chilled water plant and all necessary pumps and controls. The hospital’s chilled water system upgrade not only resolved function-ality issues, but also improved energy efficiency and provided greater operational control. To create full redundancy, we added an additional chiller, bringing peace of mind to staff, ensuring a reliable, fully functional, fail-safe system to serve the hospital and patients for years to come.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs