Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The local Electrical Union needed a new hall to accommodate their current and future needs, including the potential for solar panel installation. An exposed ceiling structure meant we needed to creatively route MEP system distribution for aesthetic appeal. A tight budget and unique design required careful coordination.
We worked closely with the architect and owner’s representation to stay within the tight budget. The design called for high ceilings and very specific lighting requirements. We worked closely with the manufacturer to ensure proper lighting levels. A sloped roof meant that the Roof Top Unit (RTU) had to be placed on the ground with the other utilities. We overcame space constraints through utility coordination. KED provided the owner with a cutting-edge design for their Electrical Union Hall, including electrical vehicle charging stations.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs