Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Carle BroMenn Medical Center needed to renovate and upgrade their existing operating rooms. However, the renovations could not be done all at one time, because the hospital could not afford complete downtime of their operating rooms. The project also included pre-engineered boom ceiling systems, requiring engineering system designs around the specific, pre-purchased equipment. Additionally, the operating rooms needed to be brought up to code.
All operating rooms were brought up to current code require-ments, with a phasing schedule of two OR room renovations at one time. We incorporated the pre-purchased equipment into our designs, accommodating the specific boom ceiling systems’ needs. As a result, Carle BroMenn Medical Center now has eight, fully updated operating rooms, complete with upgraded boom ceiling systems, and spaces that meet the most current code requirements. These operating rooms were renovated without downtime, ensuring the hospital could continue serving its’ patients throughout the duration project.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s