Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Springfield Clinic wanted to open a new location in Peoria Heights, to allow for cosmetic and reconstructive surgery consultations, smaller procedures, and the sale of medical spa products and services. The existing building was an empty shell space, requiring all new electrical, mechanical, plumbing, fire alarm, and fire protection system designs.
We designed new systems for the space, including all necessary plumbing, fire alarm, fire protection, mechanical, and electrical systems. We brought new lighting, lighting controls, access control, electrical distribution, and data to the space. As a result, the new Springfield Clinic location is now open, serving the local community with all their cosmetic and surgical needs.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved