THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The Peoria Zoo was expanding to include a new Takin animal enclosure. This enclosure required unique electrical designs, based around the specific needs and abilities of the animal. Anything within reach of the animals needed to be indestructible and corrosion resistant. The enclosure would need to include lighting, fans, and electric waterers.
We designed the system to incorporate all necessary features for the animal’s habitat, including the lighting, fans, and electric waterers. All materials and equipment were chosen based on their durability and corrosion-resistance, ensuring a safe and secure system for the enclosure. As a result of the project, the Peoria Zoo now has a Takin Exhibit, creating a home for the animals and expanding the zoo experience for visitors.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s