Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
ICC needed to expand its chemistry and organic chemistry labs to accommodate a growing student population. Routing the required utilities, ductwork and piping in a poured concrete building with tight floor-to-floor elevations made coordination across disciplines essential.
By improving the architectural layout of the space, we created six new chemistry work stations, each delivering natural gas, vacuum and compressed air, hot and cold water, and acid waste capabilities for student experimentation. Two snorkel exhausts remove chemical fumes from each station. We also installed new fume hoods with adjacent vented chemical storage cabinets in both labs—including a dedicated make-up air unit for the organic chemistry lab—as well as all new lighting, overhead projection screens and smart boards.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs