THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Bringing this hospital’s existing open-heart operating room up to current standards with the addition of state-of-the-art equipment required us to work on a condensed scheduled, as the space could not be used during renovations. In addition, limited ceiling space made it challenging to accommodate new booms with lighting for surgeons.
Infection Control, HVAC and Electrical Upgrades
Renovating this critical operating room quickly and efficiently required detailed planning. One crucial component was infection control. We installed surgical-grade anti-microbial lighting equipment and designed the HVAC system to provide a minimum of 21 air changes per hour, resulting in positive air pressure and a cleanliness level equivalent to ISO class 8. We also upgraded the electrical system with isolation panels to meet code, designed a new carbon dioxide manifold room and extended medical gases to new, state-of-the-art surgical booms
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s