Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The 30,000 cfm air-handling unit serving this community hospital’s surgical center had reached the end of its life and needed to be replaced without disrupting any scheduled surgeries.
We replaced the existing air-handler with a new 30,000 cfm variable-volume unit with a quad supply fan arrangement and four variable frequency drives (VFDs). That set-up allows the hospital to modulate the fans to meet the strict temperature and humidity requirements of the surgical center, providing better efficiency and overall control. Our contractors worked around the clock over a three-day weekend to install the new unit so surgery could commence on schedule the following Monday morning.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s