Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
An old, failing HVAC system in the high school’s band room led to excess humidity and poor air quality for instructors and students. The project began in December, and the band director wanted the upgrade complete before warm weather hit in April and May.
We replaced the existing stand-alone HVAC system with a more efficient, dedicated air-handling unit connected to high school’s centralized cold-water system. We also took advantage of the band’s relocation to the auditorium to modernize other aspects of the space—updating interior finishes and installing new ceilings, audio speakers, lighting control systems and flooring. All work was completed by March.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s