Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Elmwood Community School District 322 recently underwent a major facility renovation and addition. Upgrades to its HVAC systems and related automated controls resulted in excessive operation of the dedicated outdoor air system, inconsistent control of exhaust systems and poor or conflicting temperature control in occupied areas.
We provided retro-commissioning services on the upgraded HVAC equipment and controls—evaluating construction documentation plans and conducting onsite functional testing with the district’s controls contractor responsible for the building. This effort simplified HVAC control sequences, resulting in more efficient system operation and reduced energy usage. In areas where control sequence modifications were not the answer, we recommended adding supplemental or modifying existing HVAC systems to improve performance and temperature control.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved