Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The aged chiller at the manufacturing plant had a track record of unreliability, constantly going down and without a backup chiller, plant production stopped. The growing plant needed more chilled water capacity so that the newly installed hydrotherm could work effectively. The chillers were housed in a tight space, making it difficult to perform maintenance.
Our project called for vertical skid mounted heat exchangers to position them over the bugger tank. We designed the system to have multiple chillers to handle varying loads by upgrading their chilling capacity to three 80-ton chillers and providing a backup chiller, if needed. The heat exchangers were moved inside the building, eliminating the need for glycol and providing up to 47% energy savings. Finally, we added remote evaporators, now the new state-of-the-art chilled water system allows for better control of the chilled water temperature. The new equipment has increased current production and reduced waste routine maintenance. waste as the client is getting a better product with less downtime waiting on the drum to heat or cool.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved