Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
OSF’s Sterile Processing Department (SPD) plays a critical role in hospital cleanliness and patient safety, sterilizing all instruments used during surgery. To create additional working area for the SPD, OSF in-filled a large cavity below an existing building, which had never been intended as a functioning space. The hospital asked us to design and install new systems while ensuring the SPD remained operational at all times.
Renovating a space that operates 24/7 required careful planning. We broke the project into phases, focusing first on the “dirty” side, where surgical instruments arrive for sterilization, then moving on to the “clean” area. That allowed OSF to transfer services over time and keep the SPD operating without interruption. In addition to extending HVAC, fire protection and plumbing systems from the existing building, we ensured that all systems worked effectively with the SPD’s highly specialized equipment, including cart washers, conveyor systems and automated washing systems.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s