Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Grace United Methodist Church’s Education building was experiencing control issues due to an outdated, failing boiler. This resulted in uncomfortable temperatures for children and staff. In addition to the aging boiler, the building’s HVAC system was also very difficult to operate as whole. The thermostats directly controlled the hot water valves, which is not a typical design standard.
Our design included the addition of DDC controls, which accommodated the unique thermostat-to-hot-water-valves system and also mitigated the need for constant operation. We replaced the boiler with a pair of new high efficiency condensing boilers, ensuring a more efficient and effective HVAC system. As a result, Grace United Methodist Church’s Education building now maintains comfortable temperatures all year-round, with hands-off operation, and reduced utility costs.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s