Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Williams Hall is one of many residence halls on Bradley’s campus built decades ago, and the university wanted to make it more appealing to prospective students. Because the building is fully occupied during the school year, however, improvements could only be made during the summer months—requiring the work to be completed in short time windows over the course of two years.
To bring Williams Hall up to today’s standards, we replaced its entire electrical, mechanical and plumbing infrastructure. That included updates to all wiring and cable; replacement of all piping, pumps and heat exchangers; and a complete renovation of the building’s center core restrooms with new showers, lavatories, exhaust systems and more. We also constructed a 3,500-square-foot mechanical penthouse on the roof to house the systems required to air condition the entire building. Installation of an energy recovery ventilator transfers the heat (or chill) of the building’s exhaust air to its fresh air, reducing energy costs.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved