Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
To keep its equipment and technology state of the art, this local Mazda dealership embarked on a significant expansion of the existing service department space, with other renovations planned for adjacent areas.
Service shops require specialized equipment, and this pre-engineered building was no exception. A major portion of the upgrade involved new electrical, mechanical, heating and ventilation systems — including installation of a vehicle exhaust system and trench drains. As part of the design-build team, we worked closely with the owner and the general contractor to ensure our designs improved the function and operation of the service department, as well as to provide more accurate budgets and pricing of new systems.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s