Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
OSF Behavioral Health had outgrown their existing space and needed an updated work environment that protected patient safety, privacy, dignity and respect. Careful planning had to ensue so that the design was flexible enough to meet a variety of needs for behavioral health providers as an existing building was being renovated.
Our entire design was anti-ligature to ensure patient safety. We coordinated with the utility company to bring in all new services. Due to building space restrictions, we worked with the contractor to design an elevator that didn’t require an equipment room. Adding LED lights provided greater energy efficiency. Ultimately, we provided a more efficient and economical space using state-of-the-art engineer- ing.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs