Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
Northmoor School needed air conditioning added to its building, in order to better suit the needs of the school’s students and staff. However, the building is older, and the existing spaces were not designed for the necessary air conditioning components, causing spatial constraints, and difficulty routing pathways. The school’s original boilers and pumps needed to be addressed to increase efficiency.
The boilers and pumps were replaced, resulting in better water treatment, causing a significant increase in efficiency. The increased efficiency allowed for energy cost savings for the school. We overcame the spatial constraints and pathway difficulties through detailed coordination and planning. We retrofitted a refrigerant-based DX cooling system, bringing air conditioning throughout the entire school. Northmoor School now has a fully air conditioned building, an upgraded heating system, and most importantly, a comfortable environment for students and staff.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s