Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The University of Illinois College of Medicine had two smaller classrooms that they needed to combine into a much larger classroom. The client also wanted to add a 40-inch television monitors at each of the lab tables, so the medical students could better see the professor’s demonstration.
To accommodate the electronics, our design included new electrical connections, as well as new LED light fixtures, and new automatic lighting controls. We performed load calculations for the heating and cooling changes for the space and added a new VAV zone terminal unit. Additionally, our design included an extension of the existing DDC temperature control system that served the HVAC system. As a result, the college now has a modernized, expanded classroom space to train medical professionals.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s