Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The multi-specialty clinic had outgrown the space and needed an expansion and renovation. OSF was looking to add 40 additional exam/procedure rooms to accommodate their growing patient needs. The building lacked humidity control and the HVAC system was ineffective. We were asked to address these problems in a cost-conscious fashion, while keeping the clinic open.
In order to keep the clinic operational, we carefully phased in our renovations. New boilers, chillers, and humidifiers were replaced for patient and staff comfort. We added full building automation, which allowed the HVAC to be controlled remotely. A new emergency generator and power system was installed to ensure continuity in services. The building fire protection and plumbing systems were upgraded. The result was a much more comfortable space for the clinic.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs