Designing a New Dialysis Treatment Center
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
The air handler that was previously serving the ISU Student Accounts building was antiquated and needed replacement. It was also suspended horizontally from the ceiling, making past maintenance needs difficult. Also, the new air handler would need to be tied into the existing ductwork and VAV boxes, as the rest of the system did not need replacement.
We designed a new semi-custom air handling unit (AHU) with a BAS-ready package so that it would seamlessly tie into the existing temperature control system. We relocated it to the floor-level to allow for easy maintenance for ISU personnel. We rebalanced the existing VAV boxes to the new air flows, ensuring proper levels of temperature and humidity. We upgraded to DDC controls for more precise control over the system. The Student Accounts Building now has new, state-of-the-art HVAC system that will allow for comfortable temperatures all year-round.
THE CHALLENGE The Proctor Professional Building needed to renovate its existing basement space into a new dialysis treatment center. The ceiling height brought challenges, as
THE CHALLENGE OSF HealthCare Jump Trading Simulation & Education Center needed to transform their empty, existing shell space into a new on-site nursing student training
THE CHALLENGE El Paso Park District needed to build a new recreation center. The park district requested that the new facility include four multi-purpose gymnasium
THE CHALLENGE OSF needed to expand their parking deck to accommodate the new Cancer Institute. The parking deck needed a walkway connection to the hospital’s
We will be glad to answer your questions.
We look forward to working with you.
© 2024. Copyright. KEDbluestone. All Rights Reserved.
Powered by Jarhead Labs